Lock programme-level RACI baseline (resourcing, scope, risk, vendors)pmo.dec.raci_baseline_lock

P0 GCC

Summary

Lock the programme-level RACI matrix for the four most-decision-dense categories: resourcing, scope change, risk acceptance, vendor contracts. After lock, RACI exceptions require Steerco sign-off.

Rationale prompt skeleton

Rationale should reference the four RACI questions (resourcing, scope-change, risk acceptance, vendor contracts) and note where thresholds are calibrated to budget envelope.

Default options (2)

lock_full_raci Lock full programme RACI matrix

Single comprehensive RACI baseline covering all four decision categories with explicit thresholds.

Pros
  • + Single source of truth; no ambiguity on who decides what
  • + Onboarding new stakeholders becomes faster
Cons
  • − Inflexible if thresholds turn out to be wrong
  • − Requires periodic Steerco review to keep current
lock_with_threshold_review_cadence Lock matrix with scheduled threshold review

Lock the matrix but build in a quarterly Steerco review of thresholds, especially as the programme moves between phases.

Pros
  • + Adapts to phase reality (e.g., higher thresholds during cutover)
  • + Avoids freeze-into-irrelevance
Cons
  • − Slight overhead per quarter
  • − Risk of churn if thresholds change too often

Default approval chain

  1. Admin
  2. ExecutiveViewer

Linked evidence questions (4)

id prompt workstream
pmo.q.raci_resourcing Who decides on resource allocation to the programme (hiring approvals, vendor contracts, internal team allocation)? Capture the RACI for resourcing decisions specifically. pmo.raci_baselines
pmo.q.raci_scope_change Who decides on scope changes to the programme? Capture the RACI for scope-change decisions, including thresholds at which different approvers engage. pmo.raci_baselines
pmo.q.raci_risk_acceptance Who has authority to accept programme-level risks? Capture RACI for risk acceptance, including the impact/likelihood threshold above which Steerco or sponsor sign-off is required. pmo.raci_baselines
pmo.q.raci_vendor_contracts Who approves vendor contracts on the programme? Capture RACI by contract value tier (e.g., <$50k Programme Lead, $50k-$500k Steerco, >$500k Board). pmo.raci_baselines